Block and beam and timber floors have now been installed. Steel moment frames installed. Next up is brickwork and membraned/taped insulation details for a breathable airtight wall and ceiling detail.
Stockmore street, floor structure in, steel installed.
Previous
Previous
Internal floor structure completed
Next
Next